This transition the Pike branch to End of Life. The last patch of the
branch will be tagged with pike-eol tag. The stable/pike branch cannot
be used anymore and will be deleted if this patch merges.
This is needed as stable/pike is not actively maintained in the recent
period and thus gates are mostly broken due to job failures. Besides,
by removing these branches, infra resources will be freed up, too.
Please try to identify any zuul job, that is defined outside of the
repositories in this patch (for example in openstack-zuul-jobs, etc.)
and won't be used anymore if stable/pike is deleted, and propose a job
removal patch for them.
Please +1 if the team is ready for us to proceed with this transition,
or -1 if there are still some activity on the branch and the team wants
to continue to maintain it.
Change-Id: I0aff1b575de1759ef2e91497b0f96faae35a310b
This is a procedural review to transition pike into extended maintenance by
creating the pike-em tag
It's possible that the release isn't needed (for example if there are no code
changes sine the previous release, sadly that's non-trivial to detect en masse.
If you are the PTL or release liaison for this team please +1 this review
if it is ready or -1 and take over the review to correct mistakes.
Change-Id: I0a70fe411552ed28ae1c7b9bc9eec0ef46bf602f
This is a procedural review to tag a final release for each deliverables ; and
It's possible that the release isn't needed (for example if there are no code
changes sine the previous release, sadly that's non-trivial to detect en masse.
If you are the PTL or release liaison for this team please +1 this review
if it is ready or -1 and take over the review to correct mistakes.
Change-Id: Ie913b0efbb48512a447ac15d1bbe5384b564913e
Some projects have updated their release-type for horizon
plugins in queens, but a similar change has not been done
in pike. Rather than waiting for their first stable release
request to fail, adding these changes to those deliverables
to account for these changes.
Change-Id: Ifd51d3dd1d04b1bb11d311fc46f6faf642d432c4
We no longer use the send-announcements-to field for anything.
Change-Id: Iec0b11ced00ea06ac459ad544b1cb2db20d2892d
Signed-off-by: Doug Hellmann <doug@doughellmann.com>
Create the deliverable files for Pike based on the ones that were
released during Ocata. Leave out release and branch information, since
that will be filled in for the first release.
Change-Id: Idf3e9a3eadba86038f6b69527a109a0cad79bf8c
Signed-off-by: Doug Hellmann <doug@doughellmann.com>