This transition the Pike branch to End of Life. The last patch of the
branch will be tagged with pike-eol tag. The stable/pike branch cannot
be used anymore and will be deleted if this patch merges.
This is needed as stable/pike is not actively maintained in the recent
period and thus gates are mostly broken due to job failures. Besides,
by removing these branches, infra resources will be freed up, too.
Please try to identify any zuul job, that is defined outside of the
repositories in this patch (for example in openstack-zuul-jobs, etc.)
and won't be used anymore if stable/pike is deleted, and propose a job
removal patch for them.
Please +1 if the team is ready for us to proceed with this transition,
or -1 if there are still some activity on the branch and the team wants
to continue to maintain it.
Change-Id: I5a3d03af75205dab471327ac4630bac0fdcad8b8
This is a procedural review to transition pike into extended maintenance by
creating the pike-em tag
It's possible that the release isn't needed (for example if there are no code
changes sine the previous release, sadly that's non-trivial to detect en masse.
If you are the PTL or release liaison for this team please +1 this review
if it is ready or -1 and take over the review to correct mistakes.
Change-Id: I40cdfc99882f9a35b61e70df3c3de120fc81ebab
This is a procedural review to tag a final release for each deliverables ; and
It's possible that the release isn't needed (for example if there are no code
changes sine the previous release, sadly that's non-trivial to detect en masse.
If you are the PTL or release liaison for this team please +1 this review
if it is ready or -1 and take over the review to correct mistakes.
Change-Id: Idf4c653d4ce5465c32f222d25dcfde5498f89eb3
The Pike release script had a typo that caused the release emails to
have incorrect diff output.
This patch causes the validate test to catch more typos for releases
and branches. It also fixes the typos in the existing deliverables
files so they will pass future validation.
Change-Id: If173ba0b3d8c427f0bf5f3e4972dd0848459c951
We no longer use the send-announcements-to field for anything.
Change-Id: Iec0b11ced00ea06ac459ad544b1cb2db20d2892d
Signed-off-by: Doug Hellmann <doug@doughellmann.com>
This commit is to tag the trove pike-1 deliverable. I am going to let
this merge as is, the odds of the build completing in time are small
at this point.
Change-Id: I34b8ddde93ee97e72c340a5172ffdc0edb2191b2
Create the deliverable files for Pike based on the ones that were
released during Ocata. Leave out release and branch information, since
that will be filled in for the first release.
Change-Id: Idf3e9a3eadba86038f6b69527a109a0cad79bf8c
Signed-off-by: Doug Hellmann <doug@doughellmann.com>