diff --git a/reference/incubation-integration-requirements b/reference/incubation-integration-requirements index 3254d848c..627dfcd87 100644 --- a/reference/incubation-integration-requirements +++ b/reference/incubation-integration-requirements @@ -124,7 +124,7 @@ requirements, including (but not limited to): = First Integrated Cycle Expectations = -In the release cyle after the project has graduated, the TC expects the project +In the release cycle after the project has graduated, the TC expects the project to reach a level of maturity for its first integrated release. In order for the project to graduate, the TC will need to be confident that the project will reach that level of maturity in the time allowed.