TeamingUplink was renamed to ActiveUplink, FallbackUplink was
renamed to StandbyUplink due to VMware terminology.
Rename affected tests (plans, test groups, automation) and
UI (description string).
Change-Id: Ie251ae6f6bba7a70c79ccbcbf56aa325eb937c80
-remove glance backend from dvs_reboot_vcenter_2,
dvs_reboot_vcenter_1
-update test steps in test plan acording
to removing vmware glance backend.
-update test steps of dvs_port_security_group
-change version of DVS and OpenStack
in master test plan
Change-Id: I7f810b92355cdd190e711968d8a9d3ec59d140ca
-remove methods add_router,
add_subnet_to_router,
create_network,
create_subnet from openstack file
and replace them by methods from os_actions
-fix D103
Change-Id: I9c370729057f3a43c9005b5347b28571ef242d51