Bump nova-ceph-multstore timeout
The recent change(s) to enable a lot more SSHABLE checks puts the runtime of the ceph job really close to the 2h timeout even when things are working. Sometimes it times out before it finishes even though things are progressing. Bump the timeout to avoid that. Also bump us to 8G swap to match what is set on the parent ceph job when we upgraded to jammy. We could just unset this, but better to pin it high in case that job (defined elsewhere) changes. Our job is the largest ceph job, so it makes sense that it keeps its own swap level high. Change-Id: I6cefd87671614d87d92e4675fbc989fc9453c8b9
This commit is contained in:
parent
105afb338b
commit
6ff3237149
|
@ -595,12 +595,13 @@
|
|||
irrelevant-files: *nova-base-irrelevant-files
|
||||
required-projects:
|
||||
- openstack/nova
|
||||
timeout: 9000
|
||||
pre-run:
|
||||
- playbooks/ceph/glance-setup.yaml
|
||||
vars:
|
||||
# NOTE(danms): Increase our swap size since we're dealing with
|
||||
# larger images and trigger OOMs.
|
||||
configure_swap_size: 4096
|
||||
configure_swap_size: 8192
|
||||
# NOTE(danms): These tests create an empty non-raw image, which nova
|
||||
# will refuse because we set never_download_image_if_on_rbd in this job.
|
||||
# Just skip these tests for this case.
|
||||
|
|
Loading…
Reference in New Issue