Update git submodules

* Update devstack from branch 'master'
  to 1ba76adccbf5d18a5dc6266d3808dcd97e0b9c68
  - Merge "Increase timeout for reimage operation"
  - Increase timeout for reimage operation
    
    Looking at the recent failures in the tempest-integrated-compute
    job, the reimage operation seems to be taking longer than our
    expected time of 60 seconds (which was increased because of a similar
    failure in the past, default is 20 seconds).
    The main culprit for this failure is the image conversion from qcow2
    to raw which is taking ~159 seconds.
    
    Dec 05 13:29:59.709129 np0035951188 cinder-volume[77000]: DEBUG oslo_concurrency.processutils [req-5113eccb-05ba-486a-8130-a58898c8ad35 req-0edf972a-109a-465f-a771-ceb87ecbda3e tempest-ServerActionsV293TestJSON-1780705112 None] CMD "sudo cinder-rootwrap /etc/cinder/rootwrap.conf qemu-img convert -O raw -t none -f qcow2 /opt/stack/data/cinder/conversion/image_download_dbe01f18-1c90-4536-a09a-b49f0811c7a0_copod3cm /dev/mapper/stack--volumes--lvmdriver--1-volume--073a98e8--3c89--4734--9ae5--59af25f8914a" returned: 0 in 159.272s {{(pid=77000) execute /opt/stack/data/venv/lib/python3.10/site-packages/oslo_concurrency/processutils.py:422}}
    
    The recent run took ~165 seconds on the cinder side but it failed
    early since the nova operation timed out in 60 seconds hence
    deleting the volume.
    To be on the safer side, 180 seconds seems to be a sane time for
    the operation to complete which this patch configures.
    
    Closes-Bug: 2046252
    Change-Id: I8a9628216038f6d363cab5dd8177274c9cfc17c2
This commit is contained in:
Zuul 2024-02-08 14:15:10 +00:00 committed by Gerrit Code Review
parent 0a21b47e9a
commit ea9779f52a
1 changed files with 1 additions and 1 deletions

@ -1 +1 @@
Subproject commit 15a6f3e41044bfb990da023a1c0a24c0a072cd5f
Subproject commit 1ba76adccbf5d18a5dc6266d3808dcd97e0b9c68