  • Release note files MUST be part of the code changes which introduce the noteworthy behavior change. Noteworthy behavior changes are:
    • a deprecation of a config option
    • a change of the default value of a config option
    • the removal of a config option
    • upgrade relevant actions (e.g. new required config options)
    • security fixes
  • When important bug fixes or features are done, release note files COULD be part of those code changes.

How-To

To create a new release note:

$ reno --rel-notes-dir=doc/source/releasenotes/ new file-name-goes-here

To list existing release notes:

$ reno --rel-notes-dir=doc/source/releasenotes/ list .

To build the release notes:

$ tox -e docs

Note

If you build the release notes locally, please be aware that reno only scans release note files (*.yaml) which are committed in your local repository of this project.

More information about reno can be found at: http://docs.openstack.org/developer/reno/index.html

Release Management

Note

Be aware that the description below is only a simplified summary of the official release management documentation which can be found at https://docs.openstack.org/project-team-guide/release-management.html Reading the section below doesn't replace reading the official docs.

Model

We follow the Common cycle with development milestones like Nova does. In short, this mean we will produce:

  • one full release at the end of each development cycle
  • AND three milestone releases during each development cycle.

The versioning of those releases will also follow the rules Nova uses. In short, this means we will have releases which looks like this:

  • The first full release based on Ocata has version 1.0.0.
  • A (possible) 2nd full release based on Ocata has version 1.0.1
  • The first milestone release in Pike has version 2.0.0.0b1
  • The second milestone release in Pike has version 2.0.0.0b2
  • The third milestone release in Pike has version 2.0.0.0b3
  • The first release candidate for Pike has version 2.0.0.0rc1
  • The second full release based on Pike has version 2.0.0

The versioning happens with git tags on specific commits which we will define during the (full/milestone) release process.

Process

When creating a new full release, the usual order of action is:

  • start during the RC phase (usually ~3 weeks before the release)
  • merge the open changes which need to make the release into master
  • tag the last commit in master with the release candidate tag
  • create a stable/<release> branch from that tag (master is now open for changes for the next release)
  • double-check if that release candidate needs fixes
  • tag the final release candidate 1 week before the actual release
  • tag the final full release

Note

As a project which is not under the Openstack governance, we don't use the openstack/releases repository to create releases and stable branches. See New stable branch for the HOW-TO.

Tag releases

Releases are done via Git tags. The list of releases can be found at https://github.com/openstack/nova-dpm/releases . To tag the first release candidate (RC) for the next release, follow the steps below. We use the Ocata release as an example:

  1. You need a key to sign the tag:

    $ gpg --list-keys
  2. If this is not yet done, create one:

    $ gpg --gen-key
  3. Go to the commit you want to tag (usually the latest one in master):

    $ git checkout master
    $ git pull
  4. (Optional) Double-check the list of current tags:

    $ git tag -l
  5. Create a signed tag:

    $ git tag -s 1.0.0.0rc1 -m "RC1 for the Ocata release"
  6. Push that tag via the gerrit remote (no Gerrit change will be created):

    $ git push gerrit 1.0.0.0rc1
  7. (Optional) Wait for ~5m, then you can check if the automatic release process was executed:

    $ git os-job 1.0.0.0rc1

At this point we are done with the release of a version. You might want to check if the artifacts show the new version number:

Note

RTD uses pbr to determine the version number and shows a version number higher than that you pushed before, that's fine and nothing to worry about.

Warning

Further release candidates and the final release must be tagged in the stable/<release> branch and not in the master branch.

Stable Branches

Note

Be aware that the description below is only a simplified summary of the official stable branch documentation which can be found at https://docs.openstack.org/project-team-guide/stable-branches.html Reading the section below doesn't replace reading the official docs.

Supported releases

We will have 3 simultaneously maintained branches as a maximum. These are:

  • master (N)
  • the latest stable release (N-1)
  • the older stable release (N-2)

Branches older than these will be deleted after a <release-eol> tag was applied to the last commit of that branch.

Backports

Again, we follow the same rules Nova does. In short, this means:

  • for the latest stable branch (N-1)
    • No backports of features are allowed
    • All kinds of bugfixes are allowed
  • for the older stable branch (N-2)
    • Only critical bugfixes and security patches

Fixes need to be first done in the master branch (N) and then cherry-picked into the stable branches (first N-1 and after that, if necessary, N-2).

The original Change-Id needs to be kept intact when a backport is proposed for review.

The short version of the technical side of creating a backport:

$ git checkout -t origin/stable/ocata
$ git cherry-pick -x $master_commit_id
$ git review stable/ocate

New stable branch

After the first release candidate is tagged in master, you should create the stable branch in Gerrit based on that:

  1. Check if you are a member of the Gerrit group nova-dpm-release: https://review.openstack.org/#/admin/groups/1633,members
  2. This release group is allowed to create references and tags: https://review.openstack.org/#/admin/projects/openstack/nova-dpm,access
  3. Go to https://review.openstack.org/#/admin/projects/openstack/nova-dpm,branches and enter the branch name stable/<release> and the initial revision it is based on (the release candidate tag).
    1. Example for Ocata:

      Branch Name: stable/ocata
      Initial Revision: 1.0.0.0rc1
    2. Example for Pike:

      Branch Name: stable/pike
      Initial Revision: 2.0.0.0rc1

After this is done, every open change in Gerrit which uses master as target branch will be (if it will merge) part of the next release.